A Romanian B2B photovoltaic project starts with the site’s energy profile. The plant should be sized around demand, available surfaces and applicable connection rules.

01

Collect useful data

Bills, load curves, contracted capacity, electrical diagrams, roof or car park plans and operating hours form the assessment baseline. Occupation rights and the intended term also require review.

Hourly data supports a more accurate self-consumption estimate than annual consumption alone.

02

Integrate grid connection

The process depends on capacity and the consumption point. ANRE sets out application, connection solution, technical approval, contract, installation and certification steps for prosumers up to 400 kW per consumption point.

Larger plants follow the general connection regulation and require a specific assessment.

03

Compare purchase, lease and PPA

A purchase places investment and benefits with the company. A lease spreads cost over time. A PPA charges for generated energy under agreed terms.

The decision depends on available capital, daytime demand, occupation term and preferred risk allocation.

Romania · Self-consumption 1Romania · Self-consumption 2

Informational content prepared by Lionberry Energy. Project sizing, pricing, performance and contractual structure are confirmed only after site assessment and approval by the parties.